Waterproofing check in Wollert

A waterproofing inspection looks at the wet area membranes before the tiler covers them. Showers, bathrooms, laundries and any balcony are all checked while the membrane is still open to view.

  • After the waterproofer finishes and before a single tile is laid
  • About 1 hour on site
  • Report within 24 hours
Get your Wollert inspection priceInstant price. No obligation. Same-week bookings.

Fully licensed & accredited

Stage6 of 7
When to bookAfter the waterproofer finishes and before a single tile is laid
Time on siteAbout 1 hour on site
Inspected againstAS 3740 (waterproofing of domestic wet areas), AS 3958 (tiling), NCC Volume Two Part 10.2

What is included in a Wollert waterproofing inspection

  • Membrane coverage across the floor and up the walls
  • Wall upturn heights at the shower and against hobs
  • Hob, threshold and step-down details
  • Bond breakers at wall and floor junctions
  • Floor waste flange bedded and sealed to the membrane
  • Falls to the floor waste and shower screed
  • Penetrations for taps, wastes and shower rails sealed
  • Membrane cure, damage and coverage before tiling
  • Primer and substrate preparation where visible
  • Set-down depth against the finished floor level
  • Junctions to baths, screens and vanities
  • Laundry, powder room and ensuite treated to the same standard
Why it matters here

Waterproofing inspections on Wollert builds

Wet area leaks are the most expensive defect an owner in a new estate deals with, because rectification means removing tiling and screed in a finished house. Slab movement on reactive clay puts extra work into the junctions, so angle fillets, corners and hob details have to be right the first time.

What we find at this stage in Wollert

  • Membrane stopping short of the required height on shower walls and returns
  • No bond breaker or angle fillet at floor to wall junctions and internal corners
  • Thin or patchy coats with the substrate showing through at corners and edges
  • Primer skipped on a porous substrate, so the membrane will not bond properly
  • Bath hobs and step downs left uncoated, or the membrane not turned up a hob
  • Falls to the floor waste flat or reversed, leaving water ponding in the shower
External door to the garage not installed, which lock-up stage requires, Wollert
External door to the garage not installed, which lock-up stage requires
Gap around the meter box still to be caulked, Wollert
Gap around the meter box still to be caulked
Garage floor needing a clean before the final stage, Wollert
Garage floor needing a clean before the final stage
Sample findings

Sample defects found during our waterproofing inspections in Wollert

Annotated findings from Waterproofing inspections on Wollert builds. Client addresses withheld.

Bowed skirting boards noted in one or more rooms, found during a waterproofing inspection in Wollert
Bowed skirting boards noted in one or more rooms
Eave sections needing caulking or filling before painting, found during a waterproofing inspection in Wollert
Eave sections needing caulking or filling before painting
Balcony needing a clean before handover, found during a waterproofing inspection in Wollert
Balcony needing a clean before handover
Walls bowed or out of line by more than the allowed 5mm over a straight edge, found during a waterproofing inspection in Wollert
Walls bowed or out of line by more than the allowed 5mm over a straight edge
Cavity sliding door missing its guides, so the door rubs and scratches on the frame, found during a waterproofing inspection in Wollert
Cavity sliding door missing its guides, so the door rubs and scratches on the frame

The other stages of a Wollert build

  1. Bored piers inspection in Wollert1Bored piersOnce the holes are bored and the cages are in, before any concrete goes near them
  2. Slab pre-pour inspection in Wollert2Slab pre-pourThe day before the pour, while the steel and pods are still exposed
  3. Frame inspection in Wollert3FrameOnce the trusses are up, before wrap, sarking or cladding hides anything
  4. Lock-up (pre-plaster) inspection in Wollert4Lock-up (pre-plaster)After roof, windows and brickwork, before the plasterer arrives
  5. Fixing inspection in Wollert5FixingAfter plaster, doors and cabinetry, before the painter starts
  6. Pre-handover (PCI) inspection in Wollert7Pre-handover (PCI)At practical completion, before you sign anything or hand over the final payment

All construction stage inspections in Wollert →

Guides

Construction stage guides for Wollert

All guides →

Book a waterproofing inspection in Wollert

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Waterproofing inspections in Wollert: common questions

What standard covers wet area waterproofing?

AS 3740 covers waterproofing of domestic wet areas, called up by the NCC and the ABCB Housing Provisions. It sets where membranes are required, how high they go and how junctions and penetrations are treated.

Can waterproofing be inspected after tiling?

Not properly. Once tiles and screed are down the membrane cannot be seen at all, and a fault is generally only found when water appears elsewhere in the house. This stage has a very short window.

Will you flood test the shower?

No. We inspect visually and by hand, checking coverage, heights, fillets, primer and falls. Flood testing is carried out by the waterproofer or the builder, and we can report on the result they record.

Does the waterproofer give me a certificate?

In Victoria the waterproofer should supply documentation of the products used and the work done. Keep it with your build file. A certificate records what was claimed, not that the work matches AS 3740.

Are balconies and laundries included?

Yes, wherever a membrane has been applied and is accessible on the day. External balconies, laundries and powder rooms are all treated as wet areas and are checked the same way as bathrooms.

What happens if the membrane fails after handover?

Put it to your builder in writing first. If it is not resolved you can use the Building and Plumbing Commission's dispute resolution service, formerly DBDRV, and then VCAT's Building and Property List.