Wollert Building
Inspections
★★★★★ 4.8 on Google · 570+ reviews

Fixing stage check in Wollert

Fixing stage is when the house is lined out. Skirtings, architraves, doors, cabinets and tiling are in, and the paint has not yet gone on to cover the joinery work.

  • After plaster, doors and cabinetry, before the painter starts
  • 1 to 2 hours on site
  • Report within 24 hours
Get your Wollert inspection priceInstant price. No obligation. Same-week bookings.

Fully licensed & accredited

Stage5 of 7
When to bookAfter plaster, doors and cabinetry, before the painter starts
Time on site1 to 2 hours on site
Inspected againstAS 2589 (gypsum linings), AS 3958 (tiling), the VBA Guide to Standards and Tolerances 2015 and your contract selections

What is included in a Wollert fixing inspection

  • Plasterboard joints, flushing and finish level in natural light
  • Wall flatness against the 5 mm over 1.8 m tolerance
  • Cornices, architraves and skirtings
  • Door fit, hardware, hinges and closing action
  • Door and window reveals and gaps
  • Cabinetry level and alignment, doors and drawers
  • Benchtop joins, edges and splashback junctions
  • Tiling set-out, lippage and grout where laid
  • Staircase, balustrade and handrail fixing
  • Wardrobe and linen shelving installation
  • Skirting and floor junctions before floor coverings
  • Items to raise with the site supervisor before paint
Why it matters here

Fixing inspections on Wollert builds

A house on reactive Wollert clay settles into its final shape over its first summer and winter. Joinery fitted with sloppy gaps or hard against a wall has nowhere to go when the frame moves, and that is when doors bind and cornices open. Careful fixing work is what keeps those movements out of sight.

What we find at this stage in Wollert

  • Wall sheets with visible joins, nail pops or drummy areas along a long run
  • Skirting and architrave mitres open, or gaps packed with filler and gap seal
  • Internal doors binding, uneven margins, or handles and latches misaligned
  • Cabinet doors and drawer fronts out of level with inconsistent shadow lines
  • Tiles lipping at edges, uneven grout lines and hollow sounding wall tiles
  • Cornice runs wavy, or the ceiling and wall junction cracked before painting
Step down gap in the garage still to be filled, Wollert
Step down gap in the garage still to be filled
Window head and side infills not finished, Wollert
Window head and side infills not finished
Roof brackets installed but some needing extra fixing to hold properly, Wollert
Roof brackets installed but some needing extra fixing to hold properly
Sample findings

Sample defects found during our fixing inspections in Wollert

Annotated findings from Fixing inspections on Wollert builds. Client addresses withheld.

Sliding door tracks needing a clean to stop the rollers being damaged, found during a fixing inspection in Wollert
Sliding door tracks needing a clean to stop the rollers being damaged
Uneven gap between the door and its frame, needing adjustment, found during a fixing inspection in Wollert
Uneven gap between the door and its frame, needing adjustment
Skirting nail heads still to be filled and sanded before painting, found during a fixing inspection in Wollert
Skirting nail heads still to be filled and sanded before painting
Infills missing to the sides and heads of windows and doors, found during a fixing inspection in Wollert
Infills missing to the sides and heads of windows and doors
External cladding not finished, found during a fixing inspection in Wollert
External cladding not finished

The other stages of a Wollert build

  1. Bored piers inspection in Wollert1Bored piersOnce the holes are bored and the cages are in, before any concrete goes near them
  2. Slab pre-pour inspection in Wollert2Slab pre-pourThe day before the pour, while the steel and pods are still exposed
  3. Frame inspection in Wollert3FrameOnce the trusses are up, before wrap, sarking or cladding hides anything
  4. Lock-up (pre-plaster) inspection in Wollert4Lock-up (pre-plaster)After roof, windows and brickwork, before the plasterer arrives
  5. Waterproofing inspection in Wollert6WaterproofingAfter the waterproofer finishes and before a single tile is laid
  6. Pre-handover (PCI) inspection in Wollert7Pre-handover (PCI)At practical completion, before you sign anything or hand over the final payment

All construction stage inspections in Wollert →

Guides

Construction stage guides for Wollert

All guides →

Book a fixing inspection in Wollert

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Fixing inspections in Wollert: common questions

Why inspect before painting?

Paint hides the joinery. Once two coats are on, an open mitre or a poorly set plaster joint is far harder to prove and far messier to repair, because the repair then needs repainting as well.

How are tiling and joinery judged?

Against the Guide to Standards and Tolerances 2015 in Victoria, together with the contract and your selections. That guide sets measurable limits for lipping, gaps, level and finish rather than leaving it to opinion.

Do you open cabinets and doors?

Yes, by hand. We swing doors, open drawers and check margins and catches by operating them. We do not test appliances, cooktops or any electrical or gas fitting at any point.

Is fixing stage the same as handover?

No. Fixing comes before painting and before the final trades. Handover is the practical completion inspection at the end, and most owners book both because they catch very different things.

What if my cabinetry has not arrived?

We can still inspect what is installed, and we will list what was not present on the day. If a large part of the fixing work is outstanding it is usually better to move the booking by a week.

Will the builder fix items found at this stage?

Most items at fixing stage are straightforward for the trades still on site, which is exactly why the timing works. Anything not resolved carries forward into your practical completion list.

CallGet a Free Quote